|
|
HTHP Consistometer
Operating Instructions
Part #120-00: 25,000 PSI, 400°F, Single-Cell
Part #120-05: 25,000 PSI, 400°F, Dual-Cell
Part #120-10: 40,000 PSI, 600°F, Single-Cell
Part #120-15: 40,000 PSI, 600°F, Dual-Cell
Updated: 5/29/2009
Version 2.0
Table Contents
During cementing operations, the time required for a cement slurry to set
is of primary concern. Under an ideal situation, minimal time would
be required to successfully pump the slurry, which immediately
upon placement, begins to develop compressive strength. However, if insufficient
time is allowed to fully pump the cement, it will be necessary to
drill the cement remaining in the casing string. Remedial operations such as
this are very costly. Conversely, cements that are successfully placed, but
require considerable time to cure, consume valuable rig time, which is also quite
costly. Laboratory tests should be conducted under simulated reservoir
conditions to examine the actual thickening time of the slurry. The OFITE
HTHP Consistometer was specifically engineered to determine the thickening
time of well cements under simulated downhole pressures and temperatures.
A cement is mixed and poured into the slurry cup assembly. The slurry cup
is placed into the test vessel and pressure is increased via
an air-driven
hydraulic pump. A PID temperature controller governs an internal
heater,
which maintains the necessary temperature profile, while a magnetic
drive
mechanism rotates the slurry cup assembly at 150 RPM. A potentiometer
controls an output voltage, which is directly proportional to
the amount of
torque the cement exerts upon an API-approved paddle. A chart
recorder
registers cement consistency and temperature as a function of
time.
Temperature and consistency are digitally displayed via LED
indicators.
- Pressure generated via an air-driven hydraulic
pump
- Drive table is rotated with a magnetic drive
- External cooling jacket
aids cooling of test cell
- Electronic timer with alarm,
elapsed 0.1 minute resolution
- Deadweight calibration unit
included
- Temperature, pressure, and consistency alarms
provide automatic shutdown
- Safety head with rupture disk
are provided
- Unit is fully capable of testing cements in
strict accordance to the guidelines
as stated in API Specification 10
Optional
A Digital Acquisition System (DAS) is available for both the Model 100 and
the 120. This option permits PC to
measure
and record consistency and temperature data. All measured variables
are
graphically displayed on a color monitor.
- Air/Nitrogen Supply (100 - 150 PSI / 690 - 1,035
kPa)
- Water Supply for Cooling (40 PSI / 276 kPa)
- Water Drain
- 220 Volt, 50/60 Hz, 25 Amp electrical power supply
|
Size |
66" × 36" × 32" (168 × 92 × 81 cm) |
|
Weight |
1,400 lb. (635.6 kg) |
|
Crated Size |
74" × 44" × 40" (188 × 112 × 102 cm) |
|
Crated Weight |
1,600 lb. (726.4 kg) |
|
Temperature Controller |
Digital PID, 1° Resolution |
|
Pressure Indicator |
100 PSI (690 kPa) Resolution; High and Low Pressure Alarms |
|
Slurry Cup |
150 RPM Rotational Speed; 316 Stainless Steel; Expansion Chamber |
-
120-00
OFITE MODEL 100 HTHP CONSISTOMETER, 25,000 PSI, 400°F, SINGLE CELL
-
120-05
OFITE MODEL 100 HTHP CONSISTOMETER, 25,000 PSI, 400°F, DUAL CELL
-
120-10
OFITE MODEL 120 HTHP CONSISTOMETER, 40,000 PSI, 600°F, SINGLE CELL
-
120-15
OFITE MODEL 120 HTHP CONSISTOMETER, 40,000 PSI, 600°F, DUAL CELL
Optional -
120-01
SPARE PARTS FOR ONE YEARS OPERATION FOR NO. 120-00, 25K CONSISTOMETER
-
120-11
SPARE PARTS FOR ONE YEARS OPERATION FOR NO. 120-10, 40K CONSISTOMETER
- Carefully remove the instrument from the wooden crate.
- Once the unit is in place, lock the casters by depressing the lever on
the side. This will prevent the unit from moving.
-
Connect an air or nitrogen (100 - 150 PSI / 690 - 1,035 kPa)
supply to the air supply on the back of the instrument.
This unit uses ¼" NPT female connectors for all supply lines.
-
Connect the drain and coolant supply lines, also on the
back of the unit.
- Make sure all electrical switches are
turned off and the unit is grounded.
Make the necessary electrical connections in accordance
with local
codes.
- To fill the oil reservoir, open the front cabinet
door and remove the oil
reservoir cap. Using a funnel, pour approximately four liters
(or until
full) of mineral oil into the reservoir. Replace the cap.
Make sure the
seal is air tight. Use the sight glass on the side of the
reservoir to
check the oil level.
-
Periodically inspect the oil level
within the air line lubricator. This unit is
located just upstream of the air inlet on the hydraulic
pump inside the
Consistometer cabinet. You can access it by opening
the cabinet doors
on the back of the unit. If the oil level is low, refill
it with Pacemaker T-32 oil.
The lubricator has been adjusted at the factory.
Under normal operation, one drop of oil should be
discharged into the air stream every 13 to 18 pump
strokes. This discharge can be observed through
the clear control needle on top of the lubricator. If adjustment
is necessary, rotate this needle until you observe normal discharge.
Rotate the needle clockwise to decrease the oil flow rate.
The OFITE Benchtop Consistometer includes a Eurotherm Chessell
5100V chart recorder for displaying and recording test data.
It features a removable
drive for easily transferring test data to a PC for processing.
The unit
is setup to automatically record data onto the disk during the
test.
However, for this feature to work, you must have the disk inserted
into the
drive when the unit is powered on. Otherwise, the data must
be manually
archived at the end of the test.
It is strongly recommended that you carefully study the Eurotherm
Chessell 5100V instruction manual before using this equipment.
To manually archive test data:
-
Press the "Root Menu" button.
- Press "Operator"
from the root menu.
-
At the top of the screen, choose "Archive"
and then choose "Disk".
-
Now choose the data you wish to
archive
and press the appropriate button.
When the archive process starts, you will
see a blinking green light at the top, right-hand
side of the screen. When this light
stops blinking, the archive process is complete.
The chart recorder is shipped to you with a pre-programmed configuration
file. It is highly recommended that you do not change any of
these settings.
However, in case of emergency, it is possible to restore your
configuration
from the disk that is shipped with the unit.
- At the top of
the screen, press
"Save/Restore" and choose "Restore".
- Make sure all four
options are selected,
then touch the "File Name" field.
- Press the up arrow to
access the root
directory.
- Select "Removable" and press the down
arrow to access the disk.
- Choose the file titled "config"
and press
"Open".
- When the progress bar at the top of the
screen stops, the restore process is complete.
To transfer the test data to a PC:
- Remove the disk from the chart recorder
and insert it into the appropriate
drive on the PC.
- From the Start Menu, select "Programs"
then "Eurotherm" and then click
"Review". This will open the Eurotherm Review software application.
-
From the "File" menu, select "Transfer" and then click "Files".
- Click
the "Browse" button, then choose the appropriate drive for
your
removable media. Open the "History" folder and select the
files you
wish to transfer.
-
Type a name in the "Name" field and
click "OK".
At this point you will receive a warning message. Click
"OK" again.
- When the file transfer is complete, go to
the "File" menu and click "New
Chart".
-
Click "Add Point".
- From the "Instrument" drop-down menu, choose the
name you selected
in step 5.
- Choose "Group 1" from the "Log Group" menu.
-
Now, select the Point IDs you wish to display on the chart. Hold
down
the "CTRL" button to select more than one. Click "OK".
-
The software will now create the chart based on the data
collected from
the test.
-
To jump directly to a specific data point,
click
the "Go To" button at the top of the screen.
Choose the data point you wish to view and
click "OK".
The pressure indicator not only shows you the current pressure, but it also
alerts you when the pressure rises above the value you set.
During an
alarm condition, the heater, pump, and motor will automatically
shut down.
The display shows the current pressure in KPSI. This means a
reading of
12.501 indicates a pressure of 12,501 PSI.
To set the high-pressure alarm:
- Press the "Page" button. The
display will read "AL".
- Press the "Enter" button. The
display will read "1FSH".
Press the up and down arrows to set the high-pressure setpoint.
The Eurotherm Model 2404 Temperature Controller is the most
important component of the temperature control system and
it is strongly recommended
that operators carefully study the Model 2404 instruction manual
included with the Consistometer.
If a test requires a custom
program, it is important to build and save the
program prior to creating the slurry and loading the slurry
cup.
Below is an example that illustrates how to program the controller.
In this
example, the target temperature is 150°C, which is obtained
at a rate of 2.5
degrees per minute. The target temperature of 150°C is maintained
for the
duration of 180 minutes (3 hours), after which you want to stop
the heat.
Press the "Page" button three times, and you will see "ProG
List." Use the
scroll button to decide which setting to change. Use the arrow
buttons to
change the values for that setting.
Temperature Controller
For the test described above, you will want the
following settings:
|
ProG List |
Setting |
Explanation |
| Seg |
1 |
Segment 1 |
| Type |
rmp.r |
ramp rate - other choices include ramp time and dwell |
| Tgt |
150 |
final temperature |
| Rate |
2.5 |
rate per minute |
| Segn |
2 |
Segment 2 |
| Type |
Dwell |
holds the temperature for the amount of time chosen in Dur below |
| Dur |
180 |
duration time |
| Segn |
3 |
Segment 3 |
| Type |
end |
This is the last segment |
| End.t |
sop |
Stop the heat |
To run the test, push and hold the "Run/Hold" button until the
light for Run
turns on. To stop the test, push and hold the "Run/Hold" button
until the
light for Run and Hold both turn off. Be sure and turn the "HEAT"
switch
off as well.
The temperature controller utilizes a high alarm setpoint which
will bring the
unit to an alarm condition if the temperature ever exceeds the
set value.
This value is defaulted to 200°C or 400°F, but can be programmed
to different
values.
An alarm condition will also occur if the slurry thermocouple
is unplugged.
When an alarm condition occurs, the unit will automatically
stop the heater
and pressure pump, the "ALARM" switch will light up red, the
"TEMPERATURE
CONTROLLER" will display "IFSH", and the unit will start to
beep. If
the alarm condition is resolved, the heater and pressure pump
will automatically
be turned back on.
The Benchtop Consistometer includes a built-in Eurotherm 2408i
15V Potentiometer Indicator. As the slurry cup rotates within
the unit, the potentiometer
creates a small voltage charge, which is displayed on the indicator.
This charge increases as the strength of the slurry increases.
The potentiometer indicator features a high-voltage alarm. When
the
charge reaches the specified level, an alarm condition is triggered
and the
heater, pump, and motor are automatically shut off.
To change the alarm setting, perform the following steps:
- Push the "Page" key twice. The display will read
"AL".
- Push the "Enter" key. The display will read "IFSH".
- Push the up arrow
key once to read the current setting.
- Push the up or down
arrow keys to change the setting.
After choosing the appropriate setting, press the "Page" key three times to return to the original display.
- With the slurry cup disassembled, examine the threads on the inside
of
the cylinder. The end with the larger set of threads is
the top.
- Coat the surface of the paddle and the inside
of the slurry cup with a
high-temperature grease to facilitate cement removal.
-
Insert the paddle assembly all the way into the
top of the cylinder.
Slurry Cup Cylinder
Slurry Cup Paddle
Slide the slurry cup lock ring on
top of the paddle assembly with the two
notches facing upward. Tighten the locking ring completely
using the
provided slurry cup tool.
Slurry Cup Bottom Cell Cap
Slurry Cup Locking Ring
- Prepare the cement slurry as
stated in API Specification 10.
- Pour the cement into the
slurry cup through the open bottom of the
cylinder.
-
Place the metal o-ring around the threads of
the bottom cap. Apply
high-temperature grease to the o-ring and cap surface. Screw
the cap
onto the cup and tighten with the slurry cup tool.
The slurry
cup should contain enough cement slurry that it leaks out of
the hole in the center of the cap. If it does not, remove
the cap and
refill the slurry cup. Do not add cement through the hole
in the cap.
- Screw the pivot bearing into the hole in the
center of the cap and tighten.
-
Wipe the entire slurry
cup clean to ensure that no cement remains on
the outside.
Before attempting to load the test cell, ensure that the "Air To Cylinder"
and
"Pressure Release" valves are completely closed (turned clockwise).
Also,
make sure the "Motor", "Pump", and "Heat" switches are turned
off.
-
Lower the slurry cup into the test cell ensuring
that the slurry cup drive
pins engage the drive holes at the bottom of the test
cell.
It may be necessary to start the motor briefly to confirm
that the slurry
cup is properly aligned inside the test cell.
-
Lower the
potentiometer mechanism into the test cell ensuring
that the
contact springs of the potentiometer are in alignment
with the test cell
contacts.
The slurry cup and potentiometer both have two
holes near the top for
the lift bail (provided). Use the lift bail to easily
lower the slurry cup and
potentiometer into the test cell.
- To engage the drive bar of the slurry cup into the potentiometer,
rotate
the cup with the motor for a few seconds while applying
slight pressure
to the potentiometer. Note that if the unit is in an alarm
condition the
motor will not engage.
-
Choose an o-ring for the cell cap and place it into the test cell
in the oring
groove. Place the cell cap onto the cell and hand tighten.
Two o-rings are available for the cell cap. The rubber o-ring
is easier to
use, but is not suitable for tests involving high temperature
or pressure.
The metal o-ring is more durable, but requires extra attention
when
tightening the cell cap.
If you are using a metal o-ring
for your test, be very careful when you
tighten the cell cap. Tightening the cell cap flattens the
o-ring. If you
tighten the cell cap to a certain point for one test, but
do not tighten it
as much for the next test, the seal will leak and the test
will not provide
accurate results. Once you have tightened the cell cap,
mark the test
cell and cell cap so that you know how much to tighten it
for the next
test. It is recommended that you hand-tighten the cell until
it is close to
the mark, then use a rubber mallet to gently tap the cell
cap into position.
This will ensure that you do not accidentally over-tighten.
If you tighten the cell cap past the marked position, you
must
make a new mark and refer to it for the next test.
- Plug
the thermocouple into the port on the side of the unit.
Insert the
thermocouple into the hole in the top of the cell cap and
tighten the
thread gland finger tight. Then loosen it 1/8 of a turn.
- Turn on the air supply.
- With a 5/8" wrench handy, turn the "Oil Reservoir
Valve" to "Fill Cell".
The test cell will begin to fill with mineral oil from the
reservoir below.
Carefully watch the top of the test cell. When oil begins
leaking out of
the thermocouple hole, tighten the thread gland with the
wrench. This
will ensure that no air remains within the test cell.
- Turn on the "Motor" and "15 VDC" switches. Switch the "Slurry/Test
Cell" switch to "Slurry".
-
Turn on the pump. Adjust the
pressure to the desired level by turning
the regulator clockwise.
If the pressure rises too high, open (counter clockwise)
the "Pressure
Release" valve very slowly. Close the valve immediately
to prevent all
of the pressure from leaking.
- Turn the heat on and push the "Run" button on the temperature controller.
-
Turn the "Timer" switch on and push the "R" reset button
on the timer
display.
The timer displays elapsed time to the nearest
tenth of a minute. If an
alarm condition occurs, the timer will stop. This is a troubleshooting
measure that shows you the point during the test at which
the alarm
occurred.
The "Timer" switch provides power to the timer and the "R"
reset switch
resets the timer to zero.
- If the "Alarm" switch is not
already on, turn it on now. If the "Alarm"
switch is left off, the unit can still enter into an alarm
condition, but there
will be no visual or audio signal to notify the operator.
- When the test is complete, press and hold the
"RUN/HOLD" button on
the temperature controller until the "Run" and "Hold" lights
are both off.
- Turn off the "Heat" and "15 VDC" switches
and turn on the "Cool"
switch.
- As the test cell cools, watch the pressure carefully.
As long as the temperature
is over 180°F (82.2°C), make sure the pressure is at least
1,000 PSI (6,900 kPa).
- Once the test cell has cooled,
turn off the "Pump", "Cool", and "Motor"
switches.
- Open the Pressure Release valve (counter-clockwise)
all the way.
- Turn the "Oil Reservoir Valve" to "Vent".
- Open the "Air To Cylinder"
valve (counter-clockwise). Air pressure will
force the oil back into the reservoir. You will hear a hissing
sound as air
is released. When the hissing sound stops, close the valve
(clockwise).
-
Carefully unscrew and remove the thermocouple.
Keep a rag or paper towel handy in case extra oil leaks from the cell.
- Unscrew and remove the cell cap. Remove the potentiometer and slurry cup.
- Return the cell cap to the test cell to prevent dust and other matter from
entering the cell. Close all valves and turn off all switches.
Slurry Cup
After every test, immediately disassemble the slurry cup and
clean it
thoroughly with soap and water. Be sure to remove any residual
cement before it hardens. Hardened cement on any of the parts
can
cause irreparable damage.
Magnetic Drive
After every test, examine the inside of the test cell for any
cement or
other debris. If necessary, wipe the inside of the cell with
a rag or
paper towel.
It is recommended that you periodically flush the test cell
with mineral
oil to clean out any contaminants that may have collected over
time.
- Make sure all switches are off and all valves are
closed.
- Open the test cell and remove the slurry cup and
potentiometer if
they are still in place.
-
Locate the cover and gland beneath
the test cell and remove them.
- Pull the slurry cup table
and rotor assembly up through
the test cell opening.
- Clean any abrasive particles from
the rotor assembly and lay the
assembly on a clean, flat, non-magnetic surface.
-
Place
a pail or bucket underneath the test cell. Flush the test
cell
and magnetic drive with mineral oil. Use a soft-bristle
brush to
remove any debris.
-
Thread the slurry cup table onto the rotor shaft assembly.
Pour a small amount of mineral oil into the vessel. This
will act as a
cushion when inserting the rotor assembly.
- Insert the
rotor assembly into the drive housing. Press down on the
slurry cup table until it falls into place.
- Replace the
cover and gland underneath the test cell before beginning
another test.
The potentiometer should be calibrated once a month to ensure accurate
readings.
- Place the potentiometer on the calibration stand.
Place the stand on
the edge of the Consistometer and plug it into the port
on the side of
the unit.
- Connect the wire clamps to the contacts. From
the groove going clockwise
around the unit, connect yellow, then black, then blue.
- Slide the weight into the groove and wrap the cord clockwise
around
the unit one full turn.
- Let the cord hang over the wheel
and off the table.
- Attach the hook to the cord.
-
Apply the weights to the hook according
to the chart below. Steady the
cord to minimize the amount of swinging.
When adding weights,
remember that the hook weighs 50 grams.
Therefore, to test the potentiometer at 200g, you only
need to add 150g
to the hook.
-
Firmly tap the surface of the calibration
stand with a pen or the blunt
end of a screwdriver to settle the weights and stabilize
the potentiometer.
- Lift the weight about two inches directly upward and release it.
Allow it
to fall straight down. Observe the reading on the Potentiometer
Indicator.
-
Record the reading and repeat steps 6 through
8 with each weight listed
in the chart below.
The voltage values in this chart are
only examples. Every potentiometer
is different and will, therefore produce different voltages.
The calibration
process will help you interpret the potentiometer readings
provided
by the Consistometer.
|
Mass (grams) |
Approximate Voltage |
| 100 |
2.5 |
| 200 |
5.5 |
| 300 |
8.2 |
| 400 |
10.75 |
- The potentiometer should be kept as clean as possible.
Periodically
submerge the unit in solvent to remove cement and other
materials.
-
Troubleshooting potential problems:
- If consistency (voltage) readings
fluctuate, examine the resistor and
verify that the top is smooth and consistent. If
necessary, re-insert
the resistor and lightly smooth the resistor wire
with emery cloth.
- If the consistency (voltage)
reading is zero, the resistor and contact
arm may have lost contact. Adjust the contact arm
either up or
down. If this does not correct the problem, there
may be too much
space between the windings on the resistor to conduct
the current.
If this is the case, replace the resistor.
- If
the potentiometer will not hold a calibration, the
spring is probably
either damaged or worn by corrosion. Replace the
spring.
-
To install a new resistor:
- Remove the four small screws holding the
shaft-bearing retainer to
the potentiometer assembly and remove.
- Remove
the contact arm.
- Carefully lift the damaged resistor
away from the potentiometer.
Clear the resistor groove of any foreign material.
- Carefully place the new resistor into the groove
and ensure that it is
centered between the two terminating contacts.
- Push the resistor completely into the groove with
either a mallet or a
piece of wood. It is very important to ensure that
the resistor is
completely inserted into the groove and that the
upper surface is
level.
- . Install a new contact arm and if necessary,
bend the arm either up
or down to obtain consistent contact with the resistor.
- Re-install the shaft-bearing retainer and calibrate
the potentiometer
before use.
-
To install a new calibration spring:
- Remove the shaft-bearing retainer
and contact arm.
- Carefully lift the calibration
spring from the potentiometer assembly.
- Install
the new spring. When properly installed, it should
tighten
when the center shaft is rotated counter-clockwise.
- Install a new contact arm and make adjustments as necessary to
obtain consistent contact with the resistor.
- Loosen
the three adjustment screws on the underside of
the potentiometer
assembly and rotate the spring adjuster until the
spring
rests at a relaxed state.
- Ensure that the contact
arm aligns with the contact strip and tighten
the three set screws.
- Rotate the center shaft
to ensure that the spring does not bind or
rub the potentiometer housing.
-
Replace the shaft-bearing
retainer and calibrate the potentiometer.
|